Proof, from the field.
A selection of recent installations — the challenge, the engineering response, and the outcome.
25T Double Girder EOT Crane
Challenge: Existing single girder crane could not meet new billet-handling tonnage in the fabrication bay.
Solution: Engineered a double girder EOT crane with reinforced end trucks and A6 duty classification, commissioned within 45 days.
3-Floor Goods Lift
Challenge: Manual floor-to-floor transfer was creating a bottleneck in dispatch throughput.
Solution: Installed a 3-floor hydraulic goods lift with interlocked gates, cutting transfer time by over half.
15T Rail-Mounted Gantry
Challenge: Outdoor clinker yard had no overhead runway structure to support a conventional EOT crane.
Solution: Delivered a rail-mounted gantry crane with weatherproof controls and dust-sealed motors.
Fleet of 12 Jib Cranes
Challenge: Assembly line ergonomics required localized lifting at 12 individual workstations.
Solution: Standardised a wall-mounted jib crane design, pre-fabricated off-site for a single-day install per station.
Your project could be next.
Share your requirement and we'll respond with a proposed solution.
Request a Free Quote